Aberdeen planning approval rate
Aberdeen council approved 94.2% of planning applications and refused 5.8%, based on 21,892 decisions analysed. Ranked 222nd out of 300 councils for strictness.
Last updated: August 2026 · Based on decisions from January 2020 to August 2026
94.2%
overall approval rate
Planning in Aberdeen?
Check your postcode to see approval rates specific to your ward and street.
Approval rate by application type
Different application types have different approval rates in Aberdeen. Householder and full planning applications typically have the highest volume.
Approval rate by project type
These rates are based on what homeowners are actually building in Aberdeen, mined from 21,892 proposal descriptions.
Approval rate by ward
Planning outcomes vary significantly by ward within Aberdeen. Click any ward for detailed statistics.
Hazlehead/Queen's Cross/Countesswells (3,897 decided)
94.5%
Lower Deeside (2,771 decided)
93.3%
Torry/Ferryhill (2,222 decided)
93.6%
George Street/Harbour (2,182 decided)
92.9%
Mid Stocket/Rosemount (2,034 decided)
94.6%
Dyce/Bucksburn/Danestone (1,885 decided)
93.9%
Airyhall/Broomhill/Garthdee (1,514 decided)
95.0%
Kincorth/Nigg/Cove (1,406 decided)
96.2%
Bridge Of Don (1,344 decided)
95.2%
Tillydrone/Seaton/Old Aberdeen (910 decided)
93.0%
Kingswells/Sheddocksley/Summerhill (891 decided)
96.4%
Hilton/Woodside/Stockethill (533 decided)
93.6%
Northfield/Mastrick North (279 decided)
92.5%
Wards in Aberdeen
Recent comparable decisions
The most recent residential planning decisions in Aberdeen, showing how the council decides real applications.
Installation of external 22mm gas pipe to front (retrospective) · Hazlehead/Queen's Cross/Countesswells · Wed 05 Aug 2026
Approved
Remove existing roofing, and replace with composite metal cladding panel system · Dyce/Bucksburn/Danestone · Wed 05 Aug 2026
Approved
Erection of a canopy walkway on two elevations of the existing gatehouse, works · Dyce/Bucksburn/Danestone · Wed 05 Aug 2026
Approved
Showing 3 recent comparable decisions. See more in the full report →
What gets approved near your property?
In Aberdeen, 1 in 17 applications are refused. Your PlanningLens Full Planning Analysis gives you 17 pages of intelligence specific to your property:
✓ Ward-level approval rates for your exact area
✓ Common refusal reasons in Aberdeen
✓ Your 10 nearest comparable planning decisions
✓ Appeal success rates
✓ PDF report to share with your architect
Free planning check for Aberdeen →
Free. Based on 21,892 decisions.
Compare with nearby councils
Frequently asked questions about planning in Aberdeen
What is the planning approval rate in Aberdeen?
Based on 21,892 planning decisions analysed since 2020, Aberdeen approved 94.2% of applications and refused 5.8%. The council is ranked 222nd out of 300 UK councils for approval rate.
How many planning applications are refused in Aberdeen?
Aberdeen refuses 5.8% of planning applications, roughly 1 in 17. That is lower than the UK average of 11.4%. Out of 21,892 decided applications since 2020, 1,269 were refused. PlanningLens lets you check any postcode to see which applications were refused near a specific property.
Which areas of Aberdeen have the highest planning approval rates?
The highest approval rates in Aberdeen are in Kingswells/Sheddocksley/Summerhill (96.4%), Kincorth/Nigg/Cove (96.2%), and Bridge Of Don (95.2%). Approval rates vary significantly by ward, see the full ward breakdown above.
What types of planning application are most common in Aberdeen?
The most common planning application types in Aberdeen are: Other (21,715 decisions, 94.3% approved), Listed Building (81, 90.1%), and Advertisement (55, 81.8%).
How long does a planning application take in Aberdeen?
Planning applications in Aberdeen take an average of 11.8 weeks to reach a decision, measured across 596 decisions with a recorded timeline. That is slower than the 8-week statutory target for householder applications (the statutory targets are 8 weeks for householder applications and 13 weeks for major developments). PlanningLens measures the actual time each application takes, not just the target. Aberdeen decides approximately 3,649 planning applications per year.
How do I check planning applications in Aberdeen?
You can search planning applications in Aberdeen directly on the council's official planning portal. PlanningLens also lets you check any postcode against 21,892 historical decisions in Aberdeen to see what's been approved and refused near a specific property.
How is PlanningLens approval rate data for Aberdeen calculated?
PlanningLens scrapes Aberdeen's official planning portal and analyses every published decision since January 2020. The approval rate is calculated as approved decisions divided by total decided applications, excluding withdrawn and pending applications. The full methodology, data sourcing, and Creative Commons BY 4.0 licensing terms are published at
planninglens.co.uk/methodology.