Minster planning approval rate
Minster ward in Lincoln has a 98.1% approval rate based on 779 planning decisions. Lincoln overall: 95.3%.
Last updated: March 2026
98.1%
ward approval rate
779
Decisions
764
Approved
15
Refused
95.3%
Lincoln average
Minster sits slightly above the Lincoln average, with a 2.8 point advantage. Planning outcomes here are generally favourable.
How Minster compares
Minster ward
98.1%
Lincoln overall
95.3%
Planning in Lincoln? Check your postcode to see approval rates specific to your ward and street.
Recent decisions in Minster
G1 Boundary screen - Mixed species: Prune overhanging branches back to boundary · Tue 03 Mar 2026
Installation of flue to second floor bathroom. (Listed Building Consent). · Thu 12 Feb 2026
Change of use from offices (Use Class E) to residential dwelling (Use Class C3). · Thu 29 Jan 2026
Internal alterations to facilitate change of use from Registry Office (Class E) · Tue 27 Jan 2026
Replacement of modern windows with new timber framed double glazed windows; repl · Mon 26 Jan 2026
What gets approved near your property?
In Lincoln, 1 in 21 applications are refused. Your PlanningLens Pro Report gives you 17 pages of intelligence specific to your property:
✓ Ward-level approval rates for your exact area
✓ Common refusal reasons in Lincoln
✓ Your 10 nearest comparable planning decisions
✓ Appeal success rates
✓ PDF report to share with your architect
Get Lincoln Pro Report — £79
✓ Common refusal reasons in Lincoln
✓ Your 10 nearest comparable planning decisions
✓ Appeal success rates
✓ PDF report to share with your architect
Less than one set of revised drawings. Based on 6,781 decisions.