Grays Thurrock planning approval rate
Grays Thurrock ward in Thurrock has a 76.8% approval rate based on 622 planning decisions. Thurrock overall: 80.0%.
Last updated: March 2026
76.8%
ward approval rate
622
Decisions
478
Approved
144
Refused
80.0%
Thurrock average
Grays Thurrock is 3.2 percentage points below the Thurrock average, suggesting slightly tighter scrutiny in this ward. Preparation matters more here.
How Grays Thurrock compares
Grays Thurrock ward
76.8%
Thurrock overall
80.0%
Planning in Thurrock? Check your postcode to see approval rates specific to your ward and street.
Recent decisions in Grays Thurrock
Hip to gable conversion, rear dormer and roof lights · Wed 04 Mar 2026
First floor rear extension to add a bedroom and relocating the bathroom. · Mon 16 Feb 2026
Two storey side extension, rear extension at ground floor, rear extension at fir · Thu 05 Feb 2026
Rear extension with a depth of 6.00 metres from the original rear wall of the pr · Thu 22 Jan 2026
Loft conversion with rear dormers and front roof lights · Tue 06 Jan 2026
What gets approved near your property?
In Thurrock, 1 in 5 applications are refused. Your PlanningLens Pro Report gives you 17 pages of intelligence specific to your property:
✓ Ward-level approval rates for your exact area
✓ Common refusal reasons in Thurrock
✓ Your 10 nearest comparable planning decisions
✓ Appeal success rates
✓ PDF report to share with your architect
Get Thurrock Pro Report — £79
✓ Common refusal reasons in Thurrock
✓ Your 10 nearest comparable planning decisions
✓ Appeal success rates
✓ PDF report to share with your architect
Less than one set of revised drawings. Based on 10,618 decisions.