Data-backed planning intelligence · 2,450,000+ decisions analysed across England, Scotland and Wales

Planning Permission in Enfield: 79.8% Approval Rate

Enfield Council approves 79.8% of planning applications, based on 29,826 real decisions analysed from the council’s public planning portal. The national average across all councils tracked by PlanningLens is 87.9%. Enfield sits 8.1 percentage points below the national average.

29,826 decisions analysed·Updated April 2026·Every result links to the original council record
79.8%
Approval rate
29,826
Decisions
23,804
Approved
6,022
Refused
Postcodes served by Enfield: CM16, EN1, EN2, EN3, EN4, EN7, EN8, EN9, N11, N13, N14, N18, N21, N9

How Does Enfield Decide Applications?

Enter your postcode for a personalised approval likelihood score — based on your ward and application type.

Check My Postcode

Approval Rates by Application Type in Enfield

Not all applications are treated equally. Extension types, listed building consent, and change of use applications each have very different success rates in Enfield.

Application TypeApprovedRefusedTotalRate
Other16,2643,77020,034
81.2%
Full5,0131,7096,722
74.6%
Prior Approval2,5275433,070
82.3%
See how this applies to your postcode →

These are averages. Your property is specific.

A loft conversion in one ward can have a 90% approval rate. In the next ward, 55%. The free check tells you which side you're on.

Check My Postcode

Planning Approval Rates by Ward in Enfield

Ward-level data reveals where planning applications are most and least likely to succeed. Officers, local policies, and neighbourhood character all play a role.

Ward variation in Enfield: NOT has the highest approval rate at 100.0%, while Winchmore Hill sits at 41.7%. That 58.3 percentage point gap matters — where your property sits can shift your odds significantly.
WardApprovedRefusedTotalRate
CF9082401,148
79.1%
WH7222951,017
71.0%
GA720171891
80.8%
SG630204834
75.5%
SE537192729
73.7%
HI571158729
78.3%
TO559139698
80.1%
BU532158690
77.1%
CK518146664
78.0%
SU487117604
80.6%
PG389147536
72.6%
EH382154536
71.3%
CH44591536
83.0%
UE419116535
78.3%
PE413113526
78.5%
TW398117515
77.3%
PN390106496
78.6%
BR38098478
79.5%
BO325145470
69.1%
EG347116463
74.9%
BH36394457
79.4%
RW36389452
80.3%
EL327107434
75.3%
WW33596431
77.7%
SO33877415
81.4%

Showing top 25 of 97 wards by volume. Your Pro Report includes the full ward breakdown.

See full ward breakdown →

Recent Planning Decisions in Enfield

Real residential planning decisions from Enfield council. Each reference links to the council's own planning portal so you can verify the details yourself.

ReferenceProposalDecision
26/00377/CEA
Winchmore
Extension to roof at both sides to form gable ends with rear dormer.Approved
26/00371/RE4
Haselbury
Installation of a new external wall Insulation (EWI) system and associated worksApproved
26/00123/CEA
Winchmore
Extension of roof to side to form gable, rear dormer, front roof lights and exteApproved
26/00275/CEA
Ponders End
Rear dormer, dormer to rear outrigger and front roof lights.Approved
26/00129/CEU
Palmers Green
Use of single family dwelling as House in Multiple Occupation. Approved
26/00156/HOU
Upper Edmonton
Part single, part two storey rear extension.Refused
26/00010/FUL
Palmers Green
Single storey rear extension.Approved
25/03567/FUL
Haselbury
Sub-division of site and erection of an end-of-terraced 2-storey dwelling house Approved
25/04044/FUL
Jubilee
Erection of a bin and bicycle stores.Refused
25/04043/FUL
Jubilee
Erection of a bin and bicycle stores.Refused

Before you spend £5,000+ on an architect

Find out what actually gets approved near your address first. Your Pro Report analyses the 20 nearest decisions to your property, ward-specific refusal patterns, and extension-by-extension approval patterns. Based on Enfield's 29,826 real decisions. Delivered by email in minutes.

Get My Pro Report — £79
Free instant check · Pro Report £79 · Based on 2,450,000+ real decisions

Planning Data for Nearby Councils

Compare Enfield's planning approval rates with neighbouring areas:

Explore Enfield's Planning Data

Dig deeper into Enfield's planning statistics — by ward, extension type, or project category:

Planning Guides

Data-driven guides to help you understand planning approval patterns:

Frequently Asked Questions: Planning in Enfield

What is the planning approval rate in Enfield?

Based on 29,826 planning decisions, the overall approval rate in Enfield is 79.8%. The national average across councils tracked by PlanningLens is 87.9%. However, rates vary significantly by ward and application type.

How many planning applications have been decided in Enfield?

PlanningLens has analysed 29,826 planning decisions from Enfield council. 23,804 were approved and 6,022 were refused. These figures cover decisions from January 2020 to the present.

How are planning applications decided in Enfield?

The average approval rate in Enfield is 79.8%, but outcomes depend heavily on your specific ward, the type of extension or development you are proposing, and local planning policy. Use the PlanningLens free postcode check to get a personalised score.

About Enfield Planning Data: This analysis draws on 29,826 planning decisions published by Enfield council. Every application is classified as approved or refused based on the council's own decision wording. Withdrawn applications and procedural outcomes are excluded. Approval rates vary between wards, application types, and time periods. For full details on how we collect and analyse data, see our methodology →
Check planning approval patterns in Enfield — Free