Exmoor NPA Council approves 89.1% of planning applications, based on 1,058 decisions from the council’s public planning portal. The national approval rate across the councils PlanningLens tracks is 87.43%. Exmoor NPA is 1.7 percentage points above that rate.
According to PlanningLens analysis of 254 decided applications, Exmoor NPA Council approved 94.1% of planning applications in 2025. The typical time from validation to decision in Exmoor NPA is 7.6 weeks, the median across 1,809 applications decided since January 2020. Across 1,058 decisions on record (March 2020 to January 2026), the overall approval rate in Exmoor NPA is 89.1%; the national approval rate across the councils PlanningLens tracks is 87.43%.
Source: PlanningLens (planninglens.co.uk) analysis of Exmoor NPA council planning portal records · Data to 9 January 2026 · Quote freely with attribution
Enter your postcode to see approval patterns for your ward and application type.
This table counts every decided application in Exmoor NPA, including types that the headline rate leaves out, so its totals are larger than the headline figure.
| Application Type | Approved | Refused | Total | Rate |
|---|---|---|---|---|
| Full | 816 | 100 | 916 | 89.1% |
| Other | 293 | 30 | 323 | 90.7% |
| Discharge of Conditions | 314 | 9 | 323 | 97.2% |
| Listed Building | 243 | 7 | 250 | 97.2% |
| Advertisement | 14 | 0 | 14 | 100.0% |
The free check shows approval patterns for your postcode. The property report follows by email.
Check my postcodeWard-level data reveals where planning applications are most and least likely to succeed. Officers, local policies, and neighbourhood character all play a role.
| Ward | Approved | Refused | Total | Rate |
|---|
How Exmoor NPA’s planning approval rate has changed year by year, up 5.8pp since 2020.
Bar height reflects approval rate. Colour: green ≥85%, amber ≥70%, red below 70%.
Search for a reference on the council’s planning portal to see the full record.
| Reference | Proposal | Decision |
|---|---|---|
| 6/34/25/003 | Proposed demolition of front porch and single storey side store and erection of | Approved |
| 62/49/25/009 | Proposed alterations to openings in existing single storey outbuilding. Retrospe | Approved |
| 62/49/25/010LB | Listed building consent for the proposed alterations to openings in existing sin | Approved |
| 62/50/25/011 | Proposed roofing over existing agricultural yard area | Approved |
| 6/42/25/001 | Proposed conversion of existing outbuilding to provide extension for additional | Approved |
| 6/27/25/012 | Proposed replacement of existing front porch roof with natural slate, removal of | Approved |
| 6/29/25/007LB | Listed building consent for proposed replacement window and door | Approved |
| 6/27/25/013 | Proposed erection of two replacement retaining walls (retrospective). | Approved |
| 6/29/25/006LB | Listed building consent for the proposed replacement of 1no. timber window. | Approved |
| 62/50/25/008 | Proposed replacement or reinstatement of external doors and windows to existing | Approved |
See what has been approved and refused near your address. The property report covers the 20 nearest decisions, refusal patterns in your ward and approval rates by project type, drawn from Exmoor NPA's 1,058 decisions.
Check my postcodeCompare Exmoor NPA's planning approval rates with neighbouring areas:
More council comparisons coming soon.
Dig deeper into Exmoor NPA's planning statistics, by ward, extension type, or project category:
Data-driven guides to help you understand planning approval patterns:
Yes. PlanningLens offers a free planning permission check for Exmoor NPA. Enter your postcode to instantly see approval rates for your ward and application type, based on 1,058 real decisions from Exmoor NPA council. The full property-specific report is also free and emailed within minutes.
Enter your postcode on PlanningLens for a free instant check based on Exmoor NPA's real planning decisions. The free property report goes further: it analyses the 20 nearest comparable decisions to your property, ward-level refusal patterns, and approval rates by application type. Free and emailed within minutes.
Based on 1,058 planning decisions, the overall approval rate in Exmoor NPA is 89.1%. The national approval rate across the councils PlanningLens tracks is 87.43%.
PlanningLens has analysed 1,058 planning decisions from Exmoor NPA council. 943 were approved and 115 were refused. These figures cover every decision on record for the council, March 2020 to January 2026.
The average approval rate in Exmoor NPA is 89.1%, but outcomes depend heavily on your specific ward, the type of extension or development you are proposing, and local planning policy. Use the free PlanningLens postcode check to get a personalised score.
The typical time from validation to decision in Exmoor NPA is 7.6 weeks, the median across 1,809 applications decided since January 2020. This PlanningLens figure is calculated from decision dates published by Exmoor NPA council itself, reflecting actual elapsed time rather than statutory targets.
Writing about planning in Exmoor NPA? These figures are free to republish with attribution. Copy the one-line citation, or paste the stat box into any website, CMS or newsletter, it carries its own styling and links back to this page for verification.