Falkirk Council approves 98.5% of planning applications, based on 545 real decisions analysed from the council’s public planning portal. The national average across all councils tracked by PlanningLens is 87.9%. Falkirk sits 10.6 percentage points above the national average.
Enter your postcode for a personalised approval likelihood score — based on your ward and application type.
Not all applications are treated equally. Extension types, listed building consent, and change of use applications each have very different success rates in Falkirk.
| Application Type | Approved | Refused | Total | Rate |
|---|---|---|---|---|
| Other | 498 | 7 | 505 | 98.6% |
| Advertisement | 23 | 0 | 23 | 100.0% |
| Listed Building | 13 | 0 | 13 | 100.0% |
A loft conversion in one ward can have a 90% approval rate. In the next ward, 55%. The free check tells you which side you're on.
Check My PostcodeWard-level data reveals where planning applications are most and least likely to succeed. Officers, local policies, and neighbourhood character all play a role.
| Ward | Approved | Refused | Total | Rate |
|---|---|---|---|---|
| Bonnybridge and Larbert | 76 | 1 | 77 | 98.7% |
| Carse, Kinnaird and Tryst | 71 | 1 | 72 | 98.6% |
| Upper Braes | 69 | 2 | 71 | 97.2% |
| Falkirk North | 68 | 1 | 69 | 98.6% |
| Bo'ness and Blackness | 59 | 1 | 60 | 98.3% |
| Lower Braes | 52 | 1 | 53 | 98.1% |
| Grangemouth | 50 | 0 | 50 | 100.0% |
| Denny and Banknock | 47 | 0 | 47 | 100.0% |
| Falkirk South | 42 | 1 | 43 | 97.7% |
Real residential planning decisions from Falkirk council. Each reference links to the council's own planning portal so you can verify the details yourself.
| Reference | Proposal | Decision |
|---|---|---|
| P/23/0504/FUL | Extension to Dwellinghouse | Approved |
| P/23/0478/FUL Carse, Kinnaird and Tryst | Extension to Dwellinghouse (Amendment to Planning Permission P/23/0182/FUL) | Approved |
| P/23/0465/FUL Upper Braes | Extension to Dwellinghouse | Approved |
| P/23/0466/FUL Bonnybridge and Larbert | Extension to Dwellinghouse | Approved |
| P/23/0467/FUL Bo'ness and Blackness | Alteration and Extension to Dwellinghouse, Including Construction of Raised Terr | Approved |
| P/23/0464/FUL Carse, Kinnaird and Tryst | Construction of Outbuilding | Approved |
| P/23/0454/FUL Upper Braes | Construction of 2 Dwellinghouses | Refused |
| P/23/0452/FUL Bonnybridge and Larbert | Extension to Dwellinghouse (Retrospective) | Approved |
| P/23/0448/FUL Lower Braes | Extension to Dwellinghouse | Approved |
| P/23/0449/FUL Falkirk North | Installation of Roof Mounted Solar Photovoltaic System | Approved |
Find out what actually gets approved near your address first. Your Pro Report analyses the 20 nearest decisions to your property, ward-specific refusal patterns, and extension-by-extension approval patterns. Based on Falkirk's 545 real decisions. Delivered by email in minutes.
Get My Pro Report — £79Compare Falkirk's planning approval rates with neighbouring areas:
Dig deeper into Falkirk's planning statistics — by ward, extension type, or project category:
Data-driven guides to help you understand planning approval patterns:
Based on 545 planning decisions, the overall approval rate in Falkirk is 98.5%. The national average across councils tracked by PlanningLens is 87.9%. However, rates vary significantly by ward and application type.
PlanningLens has analysed 545 planning decisions from Falkirk council. 537 were approved and 8 were refused. These figures cover decisions from January 2020 to the present.
The average approval rate in Falkirk is 98.5%, but outcomes depend heavily on your specific ward, the type of extension or development you are proposing, and local planning policy. Use the PlanningLens free postcode check to get a personalised score.