Data-backed planning intelligence · 3,820,000+ decisions analysed across England, Scotland, Wales and Northern Ireland
PlanningLens

Planning Permission in OPDC: 97.0% Approval Rate

OPDC Council approves 97.0% of planning applications, based on 1,062 real decisions analysed from the council’s public planning portal. The national average across all councils tracked by PlanningLens is 85.0%. OPDC sits 12.0 percentage points above the national average.

1,062 decisions analysed·Data to 25 September 2026·Every result links to the original council record

According to PlanningLens analysis of 128 decided applications, OPDC Council approved 93.0% of planning applications in 2025. The typical time from validation to decision in OPDC is 7.9 weeks, the median across 595 applications decided since January 2020. Across 1,062 decisions on record (February 1987 to September 2026), the overall approval rate in OPDC is 97.0%; the national average across UK councils tracked by PlanningLens is 85.0%.

Source: PlanningLens (planninglens.co.uk) analysis of OPDC council planning portal records · Data to 25 September 2026 · Quote freely with attribution

97.0%
Approval rate
1,062
Decisions
1,030
Approved
32
Refused

Free planning permission check for OPDC

Enter your postcode for a free, personalised approval pattern report, based on your ward and application type.

Check My Postcode

Approval Rates by Application Type in OPDC

Not all applications are treated equally. Extension types, listed building consent, and change of use applications each have very different success rates in OPDC.

Application TypeApprovedRefusedTotalRate
Other1,247351,282
97.3%
Prior Approval10111
90.9%
Full314
75.0%
See how this applies to your postcode →

These are averages. Your property is specific.

A loft conversion in one ward can have a 90% approval rate. In the next ward, 55%. The free check tells you which side you're on, your free property report is emailed in minutes.

Check My Postcode

Planning Approval Rates by Ward in OPDC

Ward-level data reveals where planning applications are most and least likely to succeed. Officers, local policies, and neighbourhood character all play a role.

WardApprovedRefusedTotalRate
East Acton5279536
98.3%
Stonebridge2133216
98.6%
College Park and Old Oak73073
100.0%
College Park And Old Oak22022
100.0%
Hanger Hill14014
100.0%
See full ward breakdown →

Approval Rate Trend in OPDC

How OPDC’s planning approval rate has changed year by year, down 9.1pp since 2018.

100.0%
2018
98.6%
2019
98.4%
2020
97.3%
2021
100.0%
2022
92.8%
2023
95.8%
2024
93.0%
2025
90.9%
2026

Bar height reflects approval rate. Colour: green ≥85%, amber ≥70%, red below 70%.

Recent Planning Decisions in OPDC

Real residential planning decisions from OPDC council. Each reference links to the council's own planning portal so you can verify the details yourself.

ReferenceProposalDecision
26/0128/ADVOPDC
Installation of two wooden poster-boards to the fence at the intersection of VicApproved
26/0113/FULOPDC
Rear roof extension to the main roof and rear outrigger roof, incorporating an eApproved
26/0007/FUMOPDC
Demolition of existing warehouse unit and erection of an industrial/warehouse buApproved
23/0235/FUMOPDC
Demolition of existing structures and redevelopment of the site to provide a buiApproved
26/0114/HS2OPDC
Details pursuant to condition 3 (Green Roofs) of planning reference 24/0159/HS2OApproved
26/0073/FULOPDC
Change of use from light industrial (Use Class E(g)(iii)) to storage and distribApproved
26/0057/FULOPDC
Erection of an eco sculpture.Approved
25/0196/FUMOPDC
Demolition of existing warehouse (Class B8) and phased redevelopment of site to Approved
26/0092/AODOPDC
Details of Conditions 7 (Travel Plan) and 9 (Parking Management Plan) pursuant tApproved
26/0077/HHOPDC
Rear roof extension to main roof and over rear outrigger roof and installation oApproved

Free planning intelligence, before you spend £5,000+ on an architect

Find out what actually gets approved near your address first. Your free property report analyses the 20 nearest decisions to your property, ward-specific refusal patterns, and extension-by-extension approval patterns. Based on OPDC's 1,062 real decisions. Free, emailed in minutes.

Check my postcode
Free · Property report emailed in minutes · Based on 3,820,000+ real decisions

Planning Data for Nearby Councils

Compare OPDC's planning approval rates with neighbouring areas:

Explore OPDC's Planning Data

Dig deeper into OPDC's planning statistics, by ward, extension type, or project category:

Planning Guides

Data-driven guides to help you understand planning approval patterns:

Frequently Asked Questions: Planning in OPDC

Is there a free planning permission checker for OPDC?

Yes. PlanningLens offers a free planning permission check for OPDC. Enter your postcode to instantly see approval rates for your ward and application type, based on 1,062 real decisions from OPDC council. The full property-specific report is also free and emailed within minutes.

How do I check if my planning application will be approved in OPDC?

Enter your postcode on PlanningLens for a free instant check based on OPDC's real planning decisions. The free property report goes further: it analyses the 20 nearest comparable decisions to your property, ward-level refusal patterns, and approval rates by application type. Free and emailed within minutes.

What is the planning approval rate in OPDC?

Based on 1,062 planning decisions, the overall approval rate in OPDC is 97.0%. The national average across councils tracked by PlanningLens is 85.0%. Rates vary significantly by ward and application type.

How many planning applications have been decided in OPDC?

PlanningLens has analysed 1,062 planning decisions from OPDC council. 1,030 were approved and 32 were refused. These figures cover every decision on record for the council, February 1987 to September 2026.

How are planning applications decided in OPDC?

The average approval rate in OPDC is 97.0%, but outcomes depend heavily on your specific ward, the type of extension or development you are proposing, and local planning policy. Use the free PlanningLens postcode check to get a personalised score.

How long does planning permission take in OPDC?

The typical time from validation to decision in OPDC is 7.9 weeks, the median across 595 applications decided since January 2020. This PlanningLens figure is calculated from decision dates published by OPDC council itself, reflecting actual elapsed time rather than statutory targets.

Embed or Cite This Data

Writing about planning in OPDC? These figures are free to republish with attribution. Copy the one-line citation, or paste the stat box into any website, CMS or newsletter, it carries its own styling and links back to this page for verification.

Cite this page
Embed this stat box
Planning approval rate in OPDC: 97.0%, based on 1,062 decided applications on record (February 1987 to September 2026). Typical (median) time from validation to decision since January 2020: 7.9 weeks.Source: PlanningLens · Data to 25 September 2026
About OPDC Planning Data: This analysis draws on 1,062 planning decisions published by OPDC council. Every application is classified as approved or refused based on the council's own decision wording. Withdrawn applications and procedural outcomes are excluded. Approval rates vary between wards, application types, and time periods. For full details on how we collect and analyse data, see our methodology → Wondering about timing? See how long planning permission takes across the UK →
Check planning approval patterns in OPDC, Free