Data-backed planning intelligence · 3,290,000+ decisions analysed across England, Scotland, Wales and Northern Ireland

Planning Permission in Tower Hamlets: 88.9% Approval Rate

Tower Hamlets Council approves 88.9% of planning applications, based on 25,537 real decisions analysed from the council’s public planning portal. The national average across all councils tracked by PlanningLens is 88.3%. Tower Hamlets is closely in line with the national average.

25,537 decisions analysed·Updated June 2026·Every result links to the original council record

According to PlanningLens analysis of 1,814 decided applications, Tower Hamlets Council approved 86.1% of planning applications in 2025. The average time from validation to decision in Tower Hamlets is 12.4 weeks, measured across 20,892 decided applications. Across 25,537 decisions analysed since January 2020, the overall approval rate in Tower Hamlets is 88.9%; the national average across UK councils tracked by PlanningLens is 88.3%.

Source: PlanningLens (planninglens.co.uk) analysis of Tower Hamlets council planning portal records · Updated June 2026 · Quote freely with attribution

88.9%
Approval rate
25,537
Decisions
22,707
Approved
2,830
Refused
Postcodes served by Tower Hamlets: E1, E14, E1W, E2, E3

Free planning permission check for Tower Hamlets

Enter your postcode for a free, personalised approval pattern report, based on your ward and application type.

Check My Postcode

Approval Rates by Application Type in Tower Hamlets

Not all applications are treated equally. Extension types, listed building consent, and change of use applications each have very different success rates in Tower Hamlets.

Application TypeApprovedRefusedTotalRate
Other20,8172,42623,243
89.6%
Full1,6513632,014
82.0%
Prior Approval23941280
85.4%
See how this applies to your postcode →

These are averages. Your property is specific.

A loft conversion in one ward can have a 90% approval rate. In the next ward, 55%. The free check tells you which side you're on, your free property report is emailed in minutes.

Check My Postcode

Planning Approval Rates by Ward in Tower Hamlets

Ward-level data reveals where planning applications are most and least likely to succeed. Officers, local policies, and neighbourhood character all play a role.

Ward variation in Tower Hamlets: East India And Lansbury has the highest approval rate at 99.5%, while St Dunstans sits at 75.5%. That 24.0 percentage point gap matters, where your property sits can shift your odds significantly.
WardApprovedRefusedTotalRate
Whitechapel1,9532052,158
90.5%
Bow West1,2001771,377
87.1%
Spitalfields and Banglatown1,1351691,304
87.0%
Canary Wharf1,089721,161
93.8%
Weavers9451211,066
88.6%
Bow East829103932
88.9%
Blackwall and Cubitt Town83596931
89.7%
St Katharines and Wapping78070850
91.8%
Lansbury62869697
90.1%
Mile End52196617
84.4%
Shadwell53565600
89.2%
Bethnal Green East40157458
87.6%
Limehouse40935444
92.1%
Poplar37839417
90.6%
Bethnal Green West35459413
85.7%
St Dunstans30599404
75.5%
Stepney Green32084404
79.2%
Spitalfields And Banglatown3983401
99.3%
Island Gardens28689375
76.3%
Bethnal Green29251343
85.1%
St Peters27956335
83.3%
Millwall2982300
99.3%
Blackwall And Cubitt Town2846290
97.9%
Bethnal Green North2698277
97.1%
Bromley North21941260
84.2%

Showing top 25 of 33 wards by volume. Your free property report includes the full ward breakdown.

See full ward breakdown →

Approval Rate Trend in Tower Hamlets

How Tower Hamlets’s planning approval rate has changed year by year, up 5.7pp since 2018.

84.9%
2018
91.2%
2019
88.4%
2020
86.4%
2021
86.4%
2022
85.1%
2023
86.4%
2024
86.1%
2025
90.6%
2026

Bar height reflects approval rate. Colour: green ≥85%, amber ≥70%, red below 70%.

Recent Planning Decisions in Tower Hamlets

Real residential planning decisions from Tower Hamlets council. Each reference links to the council's own planning portal so you can verify the details yourself.

ReferenceProposalDecision
PA/24/02227/A1
Bethnal Green East
Demolition of Albert Jacob House and redevelopment of the Site to provide a mixeApproved
PA/25/01216/NC
Bethnal Green West
Replacing specific existing leaded glazed window sections. The glazed sections wApproved
PA/26/00093/NC
Bromley South
Replacement of the cladding to existing bin chutes running down the entire heighApproved
PA/26/00092/NC
Bromley South
Retrospecitve application for replacement of the cladding to existing bin chutesApproved
PA/26/00786/NC
Bow West
Proposed side return and mansard roof extensionApproved
PA/26/00016/S
Canary Wharf
Submission of details for Condition 12 (Details of kitchen extract ventilation) Approved
PA/26/00769/NC
Island Gardens
Proposal for a single-storey rear extension with a flat roof. External walls finApproved
PA/26/00265/NC
St Katharines and Wapping
Erection of new dormer extensions, installation of air source heat pumps, new aiApproved
PA/26/00580/NC
Bow West
Replacement of existing single glazed windows with new double glazed timber sashApproved
PA/26/00711/NC
Bethnal Green West
New rooflights, internal alterations, replacement of an external window with a dApproved

Free planning intelligence, before you spend £5,000+ on an architect

Find out what actually gets approved near your address first. Your free property report analyses the 20 nearest decisions to your property, ward-specific refusal patterns, and extension-by-extension approval patterns. Based on Tower Hamlets's 25,537 real decisions. Free, emailed in minutes.

Check my postcode
Free · Property report emailed in minutes · Based on 3,290,000+ real decisions

Planning Data for Nearby Councils

Compare Tower Hamlets's planning approval rates with neighbouring areas:

Explore Tower Hamlets's Planning Data

Dig deeper into Tower Hamlets's planning statistics, by ward, extension type, or project category:

Planning Guides

Data-driven guides to help you understand planning approval patterns:

Frequently Asked Questions: Planning in Tower Hamlets

Is there a free planning permission checker for Tower Hamlets?

Yes. PlanningLens offers a free planning permission check for Tower Hamlets. Enter your postcode to instantly see approval rates for your ward and application type, based on 25,537 real decisions from Tower Hamlets council. The full property-specific report is also free and emailed within minutes.

How do I check if my planning application will be approved in Tower Hamlets?

Enter your postcode on PlanningLens for a free instant check based on Tower Hamlets's real planning decisions. The free property report goes further: it analyses the 20 nearest comparable decisions to your property, ward-level refusal patterns, and approval rates by application type. Free and emailed within minutes.

What is the planning approval rate in Tower Hamlets?

Based on 25,537 planning decisions, the overall approval rate in Tower Hamlets is 88.9%. The national average across councils tracked by PlanningLens is 88.3%. Rates vary significantly by ward and application type.

How many planning applications have been decided in Tower Hamlets?

PlanningLens has analysed 25,537 planning decisions from Tower Hamlets council. 22,707 were approved and 2,830 were refused. These figures cover decisions from January 2020 to the present.

How are planning applications decided in Tower Hamlets?

The average approval rate in Tower Hamlets is 88.9%, but outcomes depend heavily on your specific ward, the type of extension or development you are proposing, and local planning policy. Use the free PlanningLens postcode check to get a personalised score.

How long does planning permission take in Tower Hamlets?

The average time from validation to decision in Tower Hamlets is 12.4 weeks, measured across 20,892 decided applications. This PlanningLens figure is calculated from decision dates published by Tower Hamlets council itself, reflecting actual elapsed time rather than statutory targets.

Embed or Cite This Data

Writing about planning in Tower Hamlets? These figures are free to republish with attribution. Copy the one-line citation, or paste the stat box into any website, CMS or newsletter, it carries its own styling and links back to this page for verification.

Cite this page
Embed this stat box
Planning approval rate in Tower Hamlets: 88.9%, based on 25,537 decided applications since January 2020. Average time from validation to decision: 12.4 weeks.Source: PlanningLens · Updated June 2026
About Tower Hamlets Planning Data: This analysis draws on 25,537 planning decisions published by Tower Hamlets council. Every application is classified as approved or refused based on the council's own decision wording. Withdrawn applications and procedural outcomes are excluded. Approval rates vary between wards, application types, and time periods. For full details on how we collect and analyse data, see our methodology →
Check planning approval patterns in Tower Hamlets, Free