Data-backed planning intelligence · 3,290,000+ decisions analysed across England, Scotland, Wales and Northern Ireland

Planning Permission in Eastleigh: 80.6% Approval Rate

Eastleigh Council approves 80.6% of planning applications, based on 25,024 real decisions analysed from the council’s public planning portal. The national average across all councils tracked by PlanningLens is 88.3%. Eastleigh sits 7.7 percentage points below the national average.

25,024 decisions analysed·Updated June 2026·Every result links to the original council record

According to PlanningLens analysis of 969 decided applications, Eastleigh Council approved 81.3% of planning applications in 2025. Across 25,024 decisions analysed since January 2020, the overall approval rate in Eastleigh is 80.6%; the national average across UK councils tracked by PlanningLens is 88.3%.

Source: PlanningLens (planninglens.co.uk) analysis of Eastleigh council planning portal records · Updated June 2026 · Quote freely with attribution

80.6%
Approval rate
25,024
Decisions
20,179
Approved
4,845
Refused
Postcodes served by Eastleigh: SO21, SO30, SO31, SO32, SO50, SO53

Free planning permission check for Eastleigh

Enter your postcode for a free, personalised approval pattern report, based on your ward and application type.

Check My Postcode

Approval Rates by Application Type in Eastleigh

Not all applications are treated equally. Extension types, listed building consent, and change of use applications each have very different success rates in Eastleigh.

Application TypeApprovedRefusedTotalRate
Full12,3201,96814,288
86.2%
Trees4,8052,2377,042
68.2%
Other9501871,137
83.6%
Prior Approval682155837
81.5%
Advertisement73878816
90.4%
Discharge of Conditions35749406
87.9%
Listed Building32618344
94.8%
Certificate of Lawfulness1153154
0.6%
See how this applies to your postcode →

These are averages. Your property is specific.

A loft conversion in one ward can have a 90% approval rate. In the next ward, 55%. The free check tells you which side you're on, your free property report is emailed in minutes.

Check My Postcode

Planning Approval Rates by Ward in Eastleigh

Ward-level data reveals where planning applications are most and least likely to succeed. Officers, local policies, and neighbourhood character all play a role.

Ward variation in Eastleigh: Eastleigh Central has the highest approval rate at 88.7%, while Chandler's Ford sits at 75.4%. That 13.3 percentage point gap matters, where your property sits can shift your odds significantly.
WardApprovedRefusedTotalRate
Hiltingbury1,3374281,765
75.8%
Hiltingbury East1,0443311,375
75.9%
West End South9963141,310
76.0%
Eastleigh North9992991,298
77.0%
Bursledon and Old Netley1,0242331,257
81.5%
Botley9942151,209
82.2%
Hiltingbury West8772771,154
76.0%
Hamble-le-Rice and Butlocks Heath9551821,137
84.0%
Eastleigh Central9921271,119
88.7%
Eastleigh South8831691,052
83.9%
West End North796174970
82.1%
Chandlers Ford West749180929
80.6%
Hamble & Netley765145910
84.1%
Bursledon & Hound North745163908
82.0%
Fair Oak and Horton Heath715170885
80.8%
Hedge End St. Johns673165838
80.3%
Chandler's Ford624204828
75.4%
Hedge End South639133772
82.8%
Netley Abbey545127672
81.1%
Fair Oak & Horton Heath517104621
83.3%
Hedge End Wildern48291573
84.1%
Bishopstoke West430114544
79.0%
Bishopstoke46567532
87.4%
Hedge End Grange Park36882450
81.8%
Hedge End North330104434
76.0%

Showing top 25 of 38 wards by volume. Your free property report includes the full ward breakdown.

See full ward breakdown →

Approval Rate Trend in Eastleigh

How Eastleigh’s planning approval rate has changed year by year, up 3.0pp since 2018.

80.7%
2018
82.9%
2019
81.9%
2020
82.0%
2021
81.4%
2022
73.8%
2023
75.3%
2024
81.3%
2025
83.7%
2026

Bar height reflects approval rate. Colour: green ≥85%, amber ≥70%, red below 70%.

Recent Planning Decisions in Eastleigh

Real residential planning decisions from Eastleigh council. Each reference links to the council's own planning portal so you can verify the details yourself.

ReferenceProposalDecision
H/26/101314
Eastleigh North
Single storey front porch and rear extension. First floor rear extension on exisApproved
H/26/101340
Eastleigh South
Erection of a single storey rear extension.Approved
H/26/100990
Hedge End North
Erection of loft dormer to rear of property and single storey rear extension.Refused
H/26/101324
Bishopstoke
Erection of a two storey rear extension and removal and rebuilding of a garage aRefused
H/26/101248
Hiltingbury
Demolition of existing conservatory to be replaced by a rear single storey extenApproved
H/26/101204
Hedge End South
Proposed side and rear extension with pitched roof and 3x skylights.Approved
H/26/101262
Eastleigh South
Alterations and extensions to dwelling including enlarged front and rear dormer,Refused
L/26/101017
Bursledon & Hound North
Demolition of existing outbuilding and erection of a replacement outbuilding.Approved
H/26/101285
Fair Oak & Horton Heath
Single storey rear and side extension to existing detached garage, to tie in witApproved
H/26/101245
Hedge End North
Single storey rear extensionApproved

Free planning intelligence, before you spend £5,000+ on an architect

Find out what actually gets approved near your address first. Your free property report analyses the 20 nearest decisions to your property, ward-specific refusal patterns, and extension-by-extension approval patterns. Based on Eastleigh's 25,024 real decisions. Free, emailed in minutes.

Check my postcode
Free · Property report emailed in minutes · Based on 3,290,000+ real decisions

Planning Data for Nearby Councils

Compare Eastleigh's planning approval rates with neighbouring areas:

More council comparisons coming soon.

Explore Eastleigh's Planning Data

Dig deeper into Eastleigh's planning statistics, by ward, extension type, or project category:

Planning Guides

Data-driven guides to help you understand planning approval patterns:

Frequently Asked Questions: Planning in Eastleigh

Is there a free planning permission checker for Eastleigh?

Yes. PlanningLens offers a free planning permission check for Eastleigh. Enter your postcode to instantly see approval rates for your ward and application type, based on 25,024 real decisions from Eastleigh council. The full property-specific report is also free and emailed within minutes.

How do I check if my planning application will be approved in Eastleigh?

Enter your postcode on PlanningLens for a free instant check based on Eastleigh's real planning decisions. The free property report goes further: it analyses the 20 nearest comparable decisions to your property, ward-level refusal patterns, and approval rates by application type. Free and emailed within minutes.

What is the planning approval rate in Eastleigh?

Based on 25,024 planning decisions, the overall approval rate in Eastleigh is 80.6%. The national average across councils tracked by PlanningLens is 88.3%. Rates vary significantly by ward and application type.

How many planning applications have been decided in Eastleigh?

PlanningLens has analysed 25,024 planning decisions from Eastleigh council. 20,179 were approved and 4,845 were refused. These figures cover decisions from January 2020 to the present.

How are planning applications decided in Eastleigh?

The average approval rate in Eastleigh is 80.6%, but outcomes depend heavily on your specific ward, the type of extension or development you are proposing, and local planning policy. Use the free PlanningLens postcode check to get a personalised score.

Embed or Cite This Data

Writing about planning in Eastleigh? These figures are free to republish with attribution. Copy the one-line citation, or paste the stat box into any website, CMS or newsletter, it carries its own styling and links back to this page for verification.

Cite this page
Embed this stat box
Planning approval rate in Eastleigh: 80.6%, based on 25,024 decided applications since January 2020.Source: PlanningLens · Updated June 2026
About Eastleigh Planning Data: This analysis draws on 25,024 planning decisions published by Eastleigh council. Every application is classified as approved or refused based on the council's own decision wording. Withdrawn applications and procedural outcomes are excluded. Approval rates vary between wards, application types, and time periods. For full details on how we collect and analyse data, see our methodology →
Check planning approval patterns in Eastleigh, Free