Data-backed planning intelligence · 2,450,000+ decisions analysed across England, Scotland and Wales

Planning Permission in City of Edinburgh: 89.8% Approval Rate

City of Edinburgh Council approves 89.8% of planning applications, based on 26,447 real decisions analysed from the council’s public planning portal. The national average across all councils tracked by PlanningLens is 88.0%. City of Edinburgh sits 1.8 percentage points above the national average.

26,447 decisions analysed·Updated April 2026·Every result links to the original council record
89.8%
Approval rate
26,447
Decisions
23,741
Approved
2,706
Refused
Postcodes served by City of Edinburgh: EH1, EH10, EH11, EH12, EH13, EH14, EH15, EH16, EH17, EH2, EH21, EH3, EH4, EH46, EH5, EH6, EH7, EH8, EH9, EH99

How Does City of Edinburgh Decide Applications?

Enter your postcode for a personalised approval likelihood score — based on your ward and application type.

Check My Postcode

Approval Rates by Application Type in City of Edinburgh

Not all applications are treated equally. Extension types, listed building consent, and change of use applications each have very different success rates in City of Edinburgh.

Application TypeApprovedRefusedTotalRate
Other23,7412,70626,447
89.8%
See how this applies to your postcode →

These are averages. Your property is specific.

A loft conversion in one ward can have a 90% approval rate. In the next ward, 55%. The free check tells you which side you're on.

Check My Postcode

Planning Approval Rates by Ward in City of Edinburgh

Ward-level data reveals where planning applications are most and least likely to succeed. Officers, local policies, and neighbourhood character all play a role.

Ward variation in City of Edinburgh: No Ward Number has the highest approval rate at 98.4%, while Leith Walk sits at 81.9%. That 16.5 percentage point gap matters — where your property sits can shift your odds significantly.
WardApprovedRefusedTotalRate
City Centre4,8158375,652
85.2%
Southside/Newington1,9972272,224
89.8%
Inverleith1,9922192,211
90.1%
Almond1,5291151,644
93.0%
Corstorphine/Murrayfield1,265841,349
93.8%
Portobello/Craigmillar1,0981271,225
89.6%
Colinton/Fairmilehead1,156671,223
94.5%
Pentland Hills1,075721,147
93.7%
No Ward Number1,050171,067
98.4%
Meadows/Morningside983761,059
92.8%
Leith Walk781173954
81.9%
Morningside822104926
88.8%
Leith785123908
86.5%
Forth80687893
90.3%
Craigentinny/Duddingston75393846
89.0%
Liberton/Gilmerton75876834
90.9%
Drum Brae/Gyle72050770
93.5%
Sighthill/Gorgie53572607
88.1%
Fountainbridge/Craiglockhart (Pre May 2044135476
92.6%
Fountainbridge/Craiglockhart36149410
88.0%
Midlothian Council516
83.3%
See full ward breakdown →

Approval Rate Trend in City of Edinburgh

How City of Edinburgh’s planning approval rate has changed year by year — down 13.0pp since 2018.

91.7%
2018
92.1%
2019
92.0%
2020
92.1%
2021
87.0%
2022
74.2%
2023
83.1%
2024
78.7%
2025

Bar height reflects approval rate. Colour: green ≥85%, amber ≥70%, red below 70%.

Recent Planning Decisions in City of Edinburgh

Real residential planning decisions from City of Edinburgh council. Each reference links to the council's own planning portal so you can verify the details yourself.

ReferenceProposalDecision
26/00945/LBC
Craigentinny/Duddingston
Replacement of timber single glazing windows with uPVC double glazing windows.Approved
26/00920/LBC
No Ward Number
Internal alterations, including wall removal to form open plan kitchen /living sApproved
26/00649/FUL
Almond
Proposed single storey front extension.Approved
26/00676/LBC
City Centre
Proposed reinstatement of original doorway, previously removed in 1982.Approved
26/00864/LBC
Sighthill/Gorgie
Form new dormer window with associated internal alterations.Approved
26/00743/WINPA
Leith
The Proposal involves the replacement of all 4 existin windows within the properApproved
26/00815/FUL
Colinton/Fairmilehead
Proposed front porch.Approved
26/00727/FUL
Almond
Removal of two UPVC conservatories to the west wing and replace with glass porchApproved
26/00767/FUL
Southside/Newington
Erect sub station and switch room along with an associated boundary fence enclosApproved
26/00724/CLP
Almond
Conversion of garage to habitable space.Approved

Before you spend £5,000+ on an architect

Find out what actually gets approved near your address first. Your Pro Report analyses the 20 nearest decisions to your property, ward-specific refusal patterns, and extension-by-extension approval patterns. Based on City of Edinburgh's 26,447 real decisions. Delivered by email in minutes.

Get My Pro Report — £79
Free instant check · Pro Report £79 · Based on 2,450,000+ real decisions

Planning Data for Nearby Councils

Compare City of Edinburgh's planning approval rates with neighbouring areas:

More council comparisons coming soon.

Explore City of Edinburgh's Planning Data

Dig deeper into City of Edinburgh's planning statistics — by ward, extension type, or project category:

Planning Guides

Data-driven guides to help you understand planning approval patterns:

Frequently Asked Questions: Planning in City of Edinburgh

What is the planning approval rate in City of Edinburgh?

Based on 26,447 planning decisions, the overall approval rate in City of Edinburgh is 89.8%. The national average across councils tracked by PlanningLens is 88.0%. However, rates vary significantly by ward and application type.

How many planning applications have been decided in City of Edinburgh?

PlanningLens has analysed 26,447 planning decisions from City of Edinburgh council. 23,741 were approved and 2,706 were refused. These figures cover decisions from January 2020 to the present.

How are planning applications decided in City of Edinburgh?

The average approval rate in City of Edinburgh is 89.8%, but outcomes depend heavily on your specific ward, the type of extension or development you are proposing, and local planning policy. Use the PlanningLens free postcode check to get a personalised score.

About City of Edinburgh Planning Data: This analysis draws on 26,447 planning decisions published by City of Edinburgh council. Every application is classified as approved or refused based on the council's own decision wording. Withdrawn applications and procedural outcomes are excluded. Approval rates vary between wards, application types, and time periods. For full details on how we collect and analyse data, see our methodology →
Check planning approval patterns in City of Edinburgh — Free