Data-backed planning intelligence · 3,290,000+ decisions analysed across England, Scotland, Wales and Northern Ireland

Planning Permission in Islington: 82.8% Approval Rate

Islington Council approves 82.8% of planning applications, based on 85,009 real decisions analysed from the council’s public planning portal. The national average across all councils tracked by PlanningLens is 88.3%. Islington sits 5.5 percentage points below the national average.

85,009 decisions analysed·Updated June 2026·Every result links to the original council record

According to PlanningLens analysis of 2,263 decided applications, Islington Council approved 89.7% of planning applications in 2025. The average time from validation to decision in Islington is 11.2 weeks, measured across 82,111 decided applications. Across 85,009 decisions analysed since January 2020, the overall approval rate in Islington is 82.8%; the national average across UK councils tracked by PlanningLens is 88.3%.

Source: PlanningLens (planninglens.co.uk) analysis of Islington council planning portal records · Updated June 2026 · Quote freely with attribution

82.8%
Approval rate
85,009
Decisions
70,396
Approved
14,613
Refused
Postcodes served by Islington: EC1, EC1R, EC1V, N1, N19, N1C, N5, N7

Free planning permission check for Islington

Enter your postcode for a free, personalised approval pattern report, based on your ward and application type.

Check My Postcode

Approval Rates by Application Type in Islington

Not all applications are treated equally. Extension types, listed building consent, and change of use applications each have very different success rates in Islington.

Application TypeApprovedRefusedTotalRate
Other69,87614,46984,345
82.8%
Full494112606
81.5%
Prior Approval263258
44.8%
See how this applies to your postcode →

These are averages. Your property is specific.

A loft conversion in one ward can have a 90% approval rate. In the next ward, 55%. The free check tells you which side you're on, your free property report is emailed in minutes.

Check My Postcode

Approval Rate Trend in Islington

How Islington’s planning approval rate has changed year by year, up 4.4pp since 2018.

82.0%
2018
88.0%
2019
83.8%
2020
84.4%
2021
87.2%
2022
89.4%
2023
92.7%
2024
89.7%
2025
86.4%
2026

Bar height reflects approval rate. Colour: green ≥85%, amber ≥70%, red below 70%.

Recent Planning Decisions in Islington

Real residential planning decisions from Islington council. Each reference links to the council's own planning portal so you can verify the details yourself.

ReferenceProposalDecision
P2026/1641/TRE
Rear gardens: Olive (T1) - reduce crown by 1.5m and prune back to boundary brancApproved
P2026/0029/MIN
1 x 3 storey extension (3 new units) Written advice with site visit £1,378.42Approved
P2026/1182/TRE
Rear garden: Leyland Cypress T1 (20M high, 700mm dia.) - Fell to ground levelApproved
P2026/1450/TRE
This 12m mature triple-stem sycamore located on the rear boundary line has been Approved
P2026/1309/LBC
Proposed window repairs and installation of secondary glazing.Approved
P2026/1475/TRE
Rear garden: Norway Maple T1 (18M high, 700mm dia.) - Reduce the crown of theApproved
P2026/1534/TRE
25 Wallace RoadApproved
P2026/1499/TRE
Front garden F/G - 4 X lime trees: crown reduce trees back to previous points oApproved
P2026/1500/TRE
Plum (in number 50) (T1)- prune back overhanging branches by 2m, to the boundaryApproved
P2026/1478/TRE
Rear garden: Hazel T1 (12M high, multi-stemmed) - Reduce down to height of boApproved

Free planning intelligence, before you spend £5,000+ on an architect

Find out what actually gets approved near your address first. Your free property report analyses the 20 nearest decisions to your property, ward-specific refusal patterns, and extension-by-extension approval patterns. Based on Islington's 85,009 real decisions. Free, emailed in minutes.

Check my postcode
Free · Property report emailed in minutes · Based on 3,290,000+ real decisions

Planning Data for Nearby Councils

Compare Islington's planning approval rates with neighbouring areas:

Explore Islington's Planning Data

Dig deeper into Islington's planning statistics, by ward, extension type, or project category:

Planning Guides

Data-driven guides to help you understand planning approval patterns:

Frequently Asked Questions: Planning in Islington

Is there a free planning permission checker for Islington?

Yes. PlanningLens offers a free planning permission check for Islington. Enter your postcode to instantly see approval rates for your ward and application type, based on 85,009 real decisions from Islington council. The full property-specific report is also free and emailed within minutes.

How do I check if my planning application will be approved in Islington?

Enter your postcode on PlanningLens for a free instant check based on Islington's real planning decisions. The free property report goes further: it analyses the 20 nearest comparable decisions to your property, ward-level refusal patterns, and approval rates by application type. Free and emailed within minutes.

What is the planning approval rate in Islington?

Based on 85,009 planning decisions, the overall approval rate in Islington is 82.8%. The national average across councils tracked by PlanningLens is 88.3%. Rates vary significantly by ward and application type.

How many planning applications have been decided in Islington?

PlanningLens has analysed 85,009 planning decisions from Islington council. 70,396 were approved and 14,613 were refused. These figures cover decisions from January 2020 to the present.

How are planning applications decided in Islington?

The average approval rate in Islington is 82.8%, but outcomes depend heavily on your specific ward, the type of extension or development you are proposing, and local planning policy. Use the free PlanningLens postcode check to get a personalised score.

How long does planning permission take in Islington?

The average time from validation to decision in Islington is 11.2 weeks, measured across 82,111 decided applications. This PlanningLens figure is calculated from decision dates published by Islington council itself, reflecting actual elapsed time rather than statutory targets.

Embed or Cite This Data

Writing about planning in Islington? These figures are free to republish with attribution. Copy the one-line citation, or paste the stat box into any website, CMS or newsletter, it carries its own styling and links back to this page for verification.

Cite this page
Embed this stat box
Planning approval rate in Islington: 82.8%, based on 85,009 decided applications since January 2020. Average time from validation to decision: 11.2 weeks.Source: PlanningLens · Updated June 2026
About Islington Planning Data: This analysis draws on 85,009 planning decisions published by Islington council. Every application is classified as approved or refused based on the council's own decision wording. Withdrawn applications and procedural outcomes are excluded. Approval rates vary between wards, application types, and time periods. For full details on how we collect and analyse data, see our methodology →
Check planning approval patterns in Islington, Free